开云体育

Project operation cooperation

Waterworks

Water Supply Project for the Donggang Industrial Park in Hepu County, Beihai City, Guangxi Zhuang Autonomous Region

Project Scale:

Designed Water Supply Capacity: 50,000 m3/d

Project Profile:

The project is located on the right bank of the Baisha River, 50 meters upstream of the Longteng Bridge in Baisha Town, Hepu County, Beihai City. The construction content includes the intake head, inlet forebay, flocculation and sedimentation tank, clean water tank, pump station, and power distribution facilities. A water purification plant is established at the Mujingshui hillside, with construction content including clean water tanks, chemical dosing, disinfection facilities, and more. A total of 11.03 km of water supply pipelines were laid, and the river water is treated and supplied to enterprises in the Donggang Industrial Park for industrial production.

The expansion of the water purification plant in this phase consists of two systems: the production treatment system and the wastewater treatment system. Water treatment process: from the inlet flow meter room - grid flocculation tank - inclined tube sedimentation tank - V-type filter (backwash pump house) - clean water tank - water supply pump house and chemical dosing room. Sludge treatment process: drainage and sludge discharge tank - sludge thickening tank - equalization tank - dewatering machine room - external transport.

Project photo: